The 1 metre rule, when lower walls still need a permit, and how to avoid problems with neighbours and council.
In Victoria, a retaining wall more than 1 metre high generally needs a building permit, and it will need an engineer's design. The permit is issued by a registered building surveyor — either a private surveyor or your council's.
If you're unsure, ask a building surveyor before you build. It's far cheaper than knocking down a non-compliant wall.
You can't redirect water onto a neighbour's land. Wall drainage needs to go to a legal point of discharge — usually the property's stormwater system — and your council can confirm where that is. If you're building on or near a shared boundary, agree the wall, cost and access with your neighbour in writing first.
As a general rule, whoever changed the natural ground level is responsible for retaining it. In new estates that's often the owner who cut or filled their block. For shared walls, it's a matter of agreement — get it in writing. For disputes, the Dispute Settlement Centre of Victoria is a free starting point.
At the measure we'll tell you whether your wall is likely to need a permit, organise engineering if it does, and build to the engineer's design. This is general information, not legal advice — your building surveyor has the final say.
Often not, but it can if it's near a boundary, building, driveway or easement, or holds up a load. Check with a building surveyor.
A registered building surveyor, either private or through your council.
Tell us a little about the job and we'll book a free on-site measure — usually within 48 hours.
No obligation · On-site measure within 48 hours · Fixed written price
★★★★★ 5.0 on Google · Quality Australian materials